Road Closures

LAKE OF THE OZARKS, Mo. — The following is a listing of general highway maintenance and construction work in the mid-Missouri area for the period of May 16–27, 2016.

Weather conditions may postpone the work schedule. Many projects will include lane closures that could cause delays. 

MoDOT reminds motorists to buckle up, slow down, follow posted signs and drive safely through work areas.

ALL COUNTIES

Daylight/Evening Hours

Occasional striping of roadways, mowing, brush cutting and guardrail repair continues in various locations.  Motorists should travel with care and be alert to slow-moving equipment along the road.

CAMDEN COUNTY

Daylight Hours

Route J over the Little Niangua River, north of Deer Meadow Road – Bridge maintenance will take place Monday, May 16 through Thursday, May 26. The bridge will be closed between 8 a.m. and 3 p.m. each weekday. Motorists are advised to seek an alternate route around the area.

MILLER COUNTY

Daylight/Overnight Hours

Route 54 over the Little Gravois Creek, west of Route V – Bridge deck replacement in the eastbound lanes is complete two weeks ahead of schedule.       

Daylight Hours

Route 54 between Business Route 54 and Route 242 – Roadway maintenance in the westbound lanes will take place Monday, May 16 through Thursday, May 19.  One westbound lane will be open through the work area.

Route 54 between Passover Road and Wood River Road – Roadway maintenance in the eastbound lanes will take place Monday, May 16 through Thursday, May 19.  One eastbound lane will be open through the work area.

Route EE between Route U and Mace Lane - Roadway maintenance will take place Monday, May 23 and Tuesday, May 24. One lane will be open, and crews will flag traffic through the work area.

Route TT between Route 42 and Alder Spring Road - Roadway maintenance will take place Monday, May 23 and Tuesday, May 24. One lane will be open, and crews will flag traffic through the work area.

MORGAN COUNTY

Daylight Hours

Route BB between Route 135 and Route D – Culvert pipe replacement will take place Monday, May 16 through Thursday, May 19. One lane will be open, and crews will flag traffic through the work area.

More information about a project is available by contacting MoDOT at 1-888-ASK-MoDOT (275-6636) or logging onto www.modot.org/central. MoDOT’s Central Missouri District is also on Twitter, at https://twitter.com/MoDOT_Central.

The MoDOT Central Missouri District also posts project updates on Facebook.


0
0
0
0
0

(0 Ratings)